Scope of work :-
# We can assist in BLUE marked work.
# Client can do the GREEN marked works without our consultancy.
# RED marked works will be completed by our company staffs only.
SEQUENCE OF WORK
- Preparation of drawings.
- Marking.
- Excavation
- Plain cement concrete floor slab with 40mm metal (1:4:8) .
- Fixing of Pool drain box and necessary plumbing.
- Steel reinforcement.
- Mat concrete with 20mm metal & super plasticizer (1: 1.5 :3).
- Wall shuttering
- Wall concrete with 20mm metal & super plasticizer (1: 1.5 :3).
- Supply of skimmer or providing Balancing tank drawing .
- Swimming pool leak checking.
- Curing and leak test.
- Pressure grouting from outside wall if you saw any leakage.
- Application of polymer modified cementites watertight coating.
- Plastering with super plasticizer.
- Providing Pump room drawing.
- Pump room construct .
- Connecting plumbing between plant room and pool.
- Back filling around pool in 1feet layers and perfect consolidation.
- Pump room electrical supply.
- Waste water drainage arrangement from pump room.
- Fixing of ladders.
- Fixing of hand rails
- Coping stone laying on the top of pool wall .
- Pool Tile laying with TILES ADHESIVES and SKILLED LABORS.
- Inlet , Drain cover, vacuum fittings & Under water light fixing .
- Installation of filter with filter sand , Pump, Starter.
- Swimming pool cleaning and water filling.
- Trial run
- 3 days pool Maintenance training.